jueves, 9 de junio de 2016

Twelfth working day

In a heated pool it is essential to the climate of this because if not, do not call it that. The air conditioning process, is that the water is at room temperature, and in the case of an indoor pool, water and air shall be kept on the same temperature.
To make this process required a lot of energy therefore in most cases other energy sources such as solar, hydro, tidal .... that depend on source were used geographic location in which you are the pool.


Climatización solar de piscina

miércoles, 8 de junio de 2016

Eleventh day of work

The type of lining of the vessels of a swimming pool depends on the conservation of it we want. This is because it can be used paints, which is the cheapest but must return has him out every 3 or 4 years which would cause the closure of the pool for a minimum of one month; slabs, which are easy to change and PVC sheets, which are more flexible but are difficult to change.




For coping of the pool should be used artificial stones due to maintenance of the same.

martes, 7 de junio de 2016

The tenth working day

In conducting the study of different forms of which can purify water from a pool we have finger realized that although all forms are very similar and equally valid maintenance needs of the necessary machines pair each of the different forms as well as the economic cost both long and short term have nothing to do.
Heated pools for the two most commonly used forms are overflowing SKIMMERS and Skimmer system. In this pool overflowing spillways use as measures that allow us to pool beaches are corresponding to the standard size.

lunes, 6 de junio de 2016

Nineth day of work

The most important element in a swimming pool because if it didn't exist, we wouldn't be talking about a pool is her vase. The vase of the pool is the structure which contain the water, at first glance looks like one of the simplest elements of the building structure, but this is not because we have to take into account its size, the necessary materials for facing , which depends on the shape of the fence which is to clean the pool. With this you can see how something so simple is so essential and what makes it complicated because without taking any account of the things mentioned above can lead to a deterioration of the glass pool. The deterioration of the glass pool determines the closing of it and it is not easy to change.

jueves, 2 de junio de 2016

martes, 3 de mayo de 2016

SEVENTH DAY OF WORK

At the two last weeks we were doing calculations for knowing the energi that it's necessary for that building for the different mounts.

lunes, 7 de marzo de 2016

5º DAY OF WORK

Today, we are thoroughly investigating the different material for select the site in which we are used it.


lunes, 29 de febrero de 2016

Fourth day of work

Today we start to organize the different information which we are used at orders day about that project.

martes, 23 de febrero de 2016

Third day of work

Today, we are search information about the different strenght that fall in a building. That help us to choose the materials which we use for that building.

lunes, 1 de febrero de 2016

SECOND DAY OF WORK

Today we have been doing a study of the plants that form the swimming pool. For it we have been using a program of technical drawing, since hereby it is easier to obtain the measures necessary to be able to realize later our project.

miércoles, 27 de enero de 2016

FIRST DAY OF WORK

Yesterday were the first day which we have to do our project. For the time that we had to do it, we are look for information of the different materials that we need to built the climatized pool, the principal was reinforced concrete, and they use it for the foundation and the pillars.

INTRODUCTION

We chosen the heated pool of Medina de Pomar because it easy for us search information to make our project.